Tile, and everything that has to be right before it.
Eight jobs, one trade. Most of them arrive together — a bathroom brings waterproofing, a floor brings demolition, and doing them as one job is the whole point.
-
Whole-home tile installation Most asked for
Every floor in the house on one schedule, done by the same hands from tear-out to final grout.
-
Bathroom renovation
Tear-out to finished room, waterproofed properly, with start and finish dates written down before demolition.
-
Curbless walk-in showers
The bathroom floor runs straight into the shower with no step — which only works if the waterproofing and the fall are right.
-
Heated floors
Electric cable, mat systems and hydronic loops — installed while the floor is already open, which is the only moment it is cheap.
-
Large-format porcelain
Big slabs are unforgiving: every millimetre the floor is out shows up as a lip you catch with your foot.
-
Waterproofing
The part nobody sees, and the only part that decides whether the room is still fine in ten years.
-
Kitchen backsplash
A small job where every single thing that can go wrong is visible from the kitchen table.
-
Tile demolition and prep
The part of the job that decides how the new floor looks, and the part every low quote skips.
-
Drywall and wall prep
The wall is the thing the tile hangs on. It is worth having the same person build it and tile it.
-
Regrouting and repairs
Sometimes the tile is fine and only the joints have failed. It is worth knowing which one you have.
Get a quote
Six short questions. A written price the same day.
No site visit to get a number, and no sales call afterwards. If the budget is not right, you will know from the reply instead of from an afternoon off work.
Rather just talk? (437) 875-1982 · English, русский, українська
- Liability insurance in place. Certificate on request.
- Written warranty on the workmanship, on request.