Alexander Marchuk Tile & Renovation

Etobicoke Toronto & the west GTA

Every floor in the house. One trade.

Whole-home tile packages, bathrooms and curbless showers — one crew from tear-out to final grout, so you are not scheduling five trades around each other.

Send a few photos of the room and the rough size — you get a written price the same day. No site visit, no sales call.

Large-format porcelain floor mid-installation, levelling clips still in place, joints running dead straight

Large-format porcelain, levelled — Etobicoke

20+
years on the tools
One
crew, tear-out to grout
EN · RU · UA
call or text in your language

Why one trade

Four trades means four schedules — and the gaps between them are yours.

Demolition, levelling, waterproofing, heating, tile. Split across separate contractors, each one waits on the last, and when something is wrong underneath nobody owns it. One crew carries the whole sequence — so the dates hold and there is one person answering for the result.

  1. 01

    Tear-out and disposal

    Old tile, old mortar, old subfloor issues. Nobody else to blame for what turns up underneath.

  2. 02

    Substrate and levelling

    The part that decides whether the floor lasts. Self-levelling compound where the slab needs it — Etobicoke bungalows usually do.

  3. 03

    Waterproofing and heat

    Membrane to spec on every wet area, heating cable or mat set before the tile goes down.

  4. 04

    Setting and grout

    Large-format levelled clip by clip, joints set out from the room, grout and silicone finished the same week.

Recent work

Finished rooms, and the work underneath them.

Every photograph here is from his own jobs — including the ones taken mid-install, because the membrane and the levelling are what you are actually buying.

  • Black PVC shower pan liner dressed up the walls with the corner folded rather than cut
    Pan liner corners folded, never cut Waterproofing
  • Close view of a shower bench edge where two porcelain slabs meet in a mitred 45-degree joint
    Bench edge mitred at 45° Detail
  • Orange PEX heating loops tied out to reinforcing mesh across an insulated basement floor before the pour
    Water heating loops tied out before the pour Heated floors
  • Waterproof board shower walls above a tiled floor held out with orange levelling clips
    Waterproof board up, floor clipped out flat Bathroom
  • Finished walk-in shower in marble-look porcelain with a half wall and a curbless entry
    Walk-in shower, no step and no trim anywhere Large format
  • Dark green handmade-look tile stacked vertically up a shower wall with a recessed niche
    Handmade-look tile, stacked and kept plumb Bathroom
All of the work, and what each photograph proves

How it works

You know the price before anything is torn out.

  1. 1

    Send photos

    A few pictures of the room and the rough size. No measuring, no appointment.

    Takes two minutes

  2. 2

    Written quote back the same day

    Itemised: demolition, prep, waterproofing, heating, tile, grout. You can compare it line by line with anyone else you asked.

    In writing, in English or Russian

  3. 3

    One visit to confirm

    He measures, checks the substrate and the drain, and the price is fixed before anything is torn out.

    Only once you want to go ahead

  4. 4

    One crew, start to finish

    Agreed start and finish dates, the same person on site every day, the site left clean.

    Dates in the contract

What it costs

There is no price list, because no two of these rooms are the same.

A rate per square foot would be a guess until someone has seen what is under the old floor. Send photographs and the figure comes back in writing the same day — priced from your room, not from a table. Here is what swings it.

  • What is under the old floor

    A slab that needs levelling compound, or a subfloor that has to be rebuilt, is the single biggest swing in any quote.

  • Tile size and format

    Large-format slabs need levelling clips and two people to set. Mosaic is slow for a different reason — every sheet is cut and adjusted.

  • Whether the plumbing moves

    Keeping the drain where it is can be the difference between a straightforward week and a full rebuild of the wet area.

  • Waterproofing and heat

    Both are done properly or not at all. They add cost up front and are the two things people regret skipping.

Get a quote

Six short questions. A written price the same day.

No site visit to get a number, and no sales call afterwards. If the budget is not right, you will know from the reply instead of from an afternoon off work.

Rather just talk? (437) 875-1982 · English, русский, українська

  • Liability insurance in place. Certificate on request.
  • Written warranty on the workmanship, on request.
What are you looking to have done?

Pick the closest one — you can add detail at the end.

Roughly how much area?

A guess is fine. It only has to be close enough to price.

Have you chosen the tile yet?

Either answer is normal — it changes the quote, not the welcome.

When would you want it started?

This is the answer that decides whether he can take the job.

Add a few photos

The room as it is today, and a wide shot if you can. This is what lets him price it properly without coming out. Optional, but the quote is much sharper with them.

Where should the quote go?

Written reply the same day. He will not call unless you ask him to.

Your details go to Alexander only. No mailing list.

For builders & designers

Send drawings and square footage — pricing back by trade line.

Working to a schedule of finishes, tender packages and site meetings. Twenty years of substrate, movement joint and waterproofing detail, and a crew that shows up on the date in the programme.

Questions

The things people ask before they call.

Do I need to be home for a quote?

No. Send photos of the room and a rough size and you get a written, itemised quote the same day. He only measures on site once you want to go ahead.

Which areas do you cover?

Etobicoke, Toronto West, Mississauga and North York. Staying inside a tight radius is what keeps start dates reliable.

Do you supply the tile as well?

You can buy it yourself or he can recommend material to suit the look and the budget. Either way the quote separates labour from materials so you can see what you are paying for.

Can you install heated floors under the tile?

Yes — electric cable and mat systems, and hydronic loops with the manifold set and pressure-tested. The cheapest moment to add it is while the floor is already open.

What languages do you speak?

English, Russian and Ukrainian. Call, text or WhatsApp in whichever you prefer, and the written quote comes back in that language.

Are you insured?

Yes — liability insurance is in place, and a copy of the certificate comes on request before any work starts.

Do you give a warranty on the work?

Yes, and in writing if you want it in writing. Ask for it with your quote and it comes back alongside the price.

How long does a bathroom take?

A typical full bathroom runs one to two weeks depending on what is found under the old floor and whether the plumbing moves. Start and finish dates are agreed in writing before demolition.