Alexander Marchuk Tile & Renovation

His own photographs, including the unflattering ones.

Half of these are taken mid-job, with the floor open and nothing to look at yet. They are here on purpose: a finished room proves taste, and every quote you take will show you one. What is underneath is what you are actually paying for, and it is the only part you cannot inspect once the tile is down.

  • Timber curb and blocking framed at the base of a shower opening, subfloor stripped back to bare board

    One shower, start to finish Step 1 of 8

    Shower

    The curb, built before anything is waterproofed

    A shower curb that flexes will crack the tile on top of it later, whatever is bedded underneath. It gets built solid and blocked out first, while it is still easy to do.

  • Shower walls sheeted in glass-mat gypsum board with the niche opening framed out

    One shower, start to finish Step 2 of 8

    Shower

    Glass-mat board on the walls, niche framed into the opening

    Ordinary drywall in a shower turns to porridge the first time water finds it. This is glass-mat board, and the niche is framed into the wall rather than hung on it.

  • Black PVC shower pan liner dressed up the walls with the corner folded rather than cut

    One shower, start to finish Step 3 of 8

    Waterproofing

    Pan liner corners folded, never cut

    This is the photograph worth studying. The corner is folded like paper and taken up the wall in one piece. A cut corner is a seam, and a seam in the lowest corner of a shower is where a leak starts.

  • Completed shower pan liner turned up all four walls above the height of the finished curb

    One shower, start to finish Step 4 of 8

    Waterproofing

    Liner turned up above the curb line, all four sides

    The liner goes higher than the water can ever stand. Everything above this line is finish; everything below it is the part that has to hold, and nobody will ever see it again.

  • Orange uncoupling membrane bedded across the shower floor and out onto the bathroom floor

    One shower, start to finish Step 5 of 8

    Waterproofing

    Uncoupling membrane over the whole floor

    The membrane lets the floor below move without dragging the tile with it. Wood subfloors move with the seasons; this is what stops that showing up as a cracked grout line in March.

  • Shower walls and niche fully covered in bonded orange waterproofing membrane, seams banded

    One shower, start to finish Step 6 of 8

    Waterproofing

    Walls and niche sealed as one surface

    Bonded sheet membrane over every wall, with the seams banded and the niche taken in as part of the same skin. A niche waterproofed separately from the wall around it is a box with a joint at the bottom of it.

  • Large-format marble-look porcelain going up a shower wall with levelling clips holding the plane

    One shower, start to finish Step 7 of 8

    Large format

    Large-format walls going up over the sealed shell

    Only now does anything visible happen. Every decision that keeps this shower dry was made before the first tile was lifted.

  • Finished shower with a full-width porcelain bench and a recessed shampoo shelf, veins running through the joints

    One shower, start to finish Step 8 of 8

    Shower

    The same shower, finished

    Same room as the black liner five photographs back. This is what the quote buys, and the liner is why it will still look like this in ten years.

  • Close view of a shower bench edge where two porcelain slabs meet in a mitred 45-degree joint

    Detail

    Bench edge mitred at 45°

    Two slabs cut back to 45° and closed on each other, so the edge is stone all the way round. The alternative is a plastic trim strip, which is the detail that dates a bathroom.

  • Mitred external corner on a marble-look porcelain step, joint closed to a hairline

    Detail

    The same joint, closed to a hairline

    A mitre only works if both cuts are true along the whole length. There is nowhere to hide on an edge like this and no trim that can be added afterwards.

  • Mitred corner detail on a large-format porcelain wall where the slab turns a right angle

    Detail

    Slab turning a corner without a trim strip

    The wall turns the corner in the same material it started in. This is slow work and it is the difference people feel without being able to name it.

  • Basement dug out and lined with rigid insulation board before a new slab is poured

    One basement wet room, start to finish Step 1 of 6

    Heated floors

    Insulation under the slab, before anything is poured

    Heat put into a slab that sits straight on the ground goes into the ground. The insulation under it is the difference between a warm floor and a heating bill.

  • Orange PEX heating loops tied out to reinforcing mesh across an insulated basement floor before the pour

    One basement wet room, start to finish Step 2 of 6

    Heated floors

    Water heating loops tied out before the pour

    Loops tied to the mesh at an even spacing so they stay put under the concrete. Once the pour goes over this, nothing here can be adjusted for the life of the house.

  • Wide view of the same basement with heating loops, benches formed and walls insulated, ready for concrete

    One basement wet room, start to finish Step 3 of 6

    Heated floors

    Benches formed, walls lined, ready for concrete

    The benches are formed in concrete as part of the room, not stood on the finished floor afterwards. There is no joint at their base for water to sit in.

  • Poured concrete benches and floor covered in bonded waterproofing membrane around a linear drain

    One basement wet room, start to finish Step 4 of 6

    Wet room

    The whole room brought under one membrane

    Floor, benches and walls sealed as a single surface, with the drain taken in. In a room that will be full of steam, anything treated as a separate piece becomes the weak point.

  • Second liquid waterproofing coat in blue applied over the benches and walls of the wet room

    One basement wet room, start to finish Step 5 of 6

    Waterproofing

    A second, liquid coat over the joints

    Blue over orange: a liquid membrane on top of the sheet, worked into every internal corner. Two systems doing the same job, which is what a steam room is worth.

  • Stone-look hexagon tile laid across the wet room floor and up over the formed benches

    One basement wet room, start to finish Step 6 of 6

    Wet room

    Hexagon tile taken over the floor and up the benches

    Small format on a floor that has to fall towards a drain from several directions at once. Large tile physically cannot follow that shape; hexagon can, and every fall still has to be right.

  • Waterproof board shower walls above a tiled floor held out with orange levelling clips

    Bathroom

    Waterproof board up, floor clipped out flat

    Boards taped at every seam and every screw dabbed. The clips on the floor are on every joint, not every second one — that is the twenty minutes that decides whether light crossing the floor later finds lippage.

  • Shower niche and bench formed in waterproof board with every seam sealed before tiling

    Waterproofing

    Niche and bench formed in waterproof board

    The niche is built out of the waterproofing itself rather than cut into a finished wall. Nothing has to be patched afterwards, because nothing was opened up.

  • Curbless shower floor tiled level with the bathroom floor around a central drain

    Shower

    Curbless — the shower floor runs level with the room

    No step to walk over, so all of the fall has to be built into a floor that still reads as flat. This is set out on the subfloor long before the tile arrives.

  • Linear drain set at the wall of a shower with the tile falling towards it in one plane

    Shower

    Linear drain, floor falling to it in one plane

    A linear drain lets the whole floor tilt one way instead of into four triangles, which is the only way large tile works in a shower at all.

  • Electric heating cable run into an orange membrane across an entire bathroom floor

    Heated floors

    Heating cable run across the full floor

    Even spacing across the whole floor, not just the walking lane. Cable crowded in one area and thin in another is what produces a floor with warm patches and cold ones.

  • Heating membrane bedded across a bathroom floor and up to the base of the walls

    Heated floors

    Heating membrane taken right to the walls

    It runs under where the vanity and the toilet will stand, not just the open middle. Heat that stops short of the walls is felt as a cold ring around the edge of the room.

  • Black hexagon tile being laid out from an orange uncoupling membrane along a bath

    Bathroom

    Hexagon going down over the membrane

    Half the floor is tile and half is still membrane in this frame. That is the honest state of a bathroom mid-week, and the layout was set out from the bath so the cuts land where nobody looks.

  • Finished walk-in shower in marble-look porcelain with a half wall and a curbless entry

    Large format

    Walk-in shower, no step and no trim anywhere

    Every corner in this room is a mitre. Look along the half wall: the material turns and keeps going, and there is no strip of anything covering the change of direction.

  • Shower floor in round pebble mosaic against large-format marble-look walls and a built-in niche

    Bathroom

    Pebble floor against slab walls

    Round mosaic underfoot for grip, slab on the walls for the look. Two materials with completely different joint widths, meeting on a line that had to be planned before either was ordered.

  • Basketweave marble mosaic shower floor meeting a dark green tiled wall at a low kerb

    Bathroom

    Basketweave floor, dark wall, one clean line between them

    A patterned mosaic has to arrive at the wall without a half-motif. That is decided by where the first sheet is laid, and it cannot be fixed at the end of the run.

  • Dark green handmade-look tile stacked vertically up a shower wall with a recessed niche

    Bathroom

    Handmade-look tile, stacked and kept plumb

    Every piece of this tile is a slightly different size and none of the edges are straight. Stacking it vertically means the eye follows one continuous line up the wall, which leaves nowhere for the variation to hide.

  • Bathroom floor in a custom interlocking-circle mosaic with a marble border, running into a glass shower enclosure

    Bathroom

    Custom mosaic floor, cut and set on site

    An interlocking-circle pattern has no forgiving joint anywhere in it — every ring has to close on the next one. It was cut to fit this room, not bought as a ready-made sheet layout.

  • Home sauna finished in cedar with a book-matched marble wall and dark large-format tile

    Wet room

    Sauna — cedar, book-matched marble, large-format porcelain

    Book-matched marble only reads as one slab if the veins meet across the joint. That is set out before the first sheet goes on the wall, not corrected afterwards.

  • Gloved hand setting individual blue and gold mosaic tesserae against a spirit level

    Detail

    Mosaic set piece by piece, levelled as it goes

    The level is in the frame for a reason: mosaic is where a floor goes out of plane fastest, because each piece is small enough to follow whatever is under it.

  • Kitchen backsplash in white herringbone subway tile running up to the underside of the cabinets

    Kitchen

    Herringbone backsplash, joints closed to the cabinet line

    Herringbone doubles the number of cuts and every one of them is at eye level. The run finishes tight under the cabinets, with no filler strip of trim to hide the gap.

  • Large-format tiles being set with levelling clips and wedges across a floor, joints running dead straight

    Large format

    Levelling clips on every joint

    Clips on every joint, not every second one. This is the twenty minutes that decides whether light crossing the floor later finds lippage or does not.

  • Heating mat rolled out and fixed across a prepared subfloor ready for tile

    Heated floors

    Mat system rolled out over the prepared subfloor

    The subfloor is already clean, flat and prepared before the mat is unrolled. A mat laid over debris telegraphs every lump of it through the tile.

Why there are no client names here.

No addresses, no surnames, no “Modern Master Ensuite, 2024”. People let a tradesman into their house on the understanding that it does not end up on a website, and the ones who agree to be named are asked first.

The same rule decides which photographs appear at all: these are from his own jobs. No stock, no supplier catalogue, nothing borrowed — which is also why some pages on this site carry no photograph at all instead of a borrowed one.

Get a quote

Six short questions. A written price the same day.

No site visit to get a number, and no sales call afterwards. If the budget is not right, you will know from the reply instead of from an afternoon off work.

Rather just talk? (437) 875-1982 · English, русский, українська

  • Liability insurance in place. Certificate on request.
  • Written warranty on the workmanship, on request.
What are you looking to have done?

Pick the closest one — you can add detail at the end.

Roughly how much area?

A guess is fine. It only has to be close enough to price.

Have you chosen the tile yet?

Either answer is normal — it changes the quote, not the welcome.

When would you want it started?

This is the answer that decides whether he can take the job.

Add a few photos

The room as it is today, and a wide shot if you can. This is what lets him price it properly without coming out. Optional, but the quote is much sharper with them.

Where should the quote go?

Written reply the same day. He will not call unless you ask him to.

Your details go to Alexander only. No mailing list.